Yay, we were able to go to the Extreme Home Makeover site and volunteer today! Candice and I helped by cutting concrete reinforcement wire to the right size, which was fun (but also hard work, especially out in the hot sun). We were so glad to be able to help out and be a part of the whole thing. We even saw Ty, Paul, and one of the girl actors while they were filming. I wasn't able to get pictures of the house or property due to all of the production crew and filming going on. Here are some pictures from the boiler Matt and Bill installed inside the boxer training facility.
There was a huge fan-the biggest ceiling fan I have ever seen-in the facility that was pretty cool. I watched Ty "help" put up some blades, which was really just filming him pretending to put blades on.
Candice and I were goofballs in the car on the drive to the house.
2 comments:
So how long did it really take to build the house? Let me know when you know when it is airing so I can DVR it (Hopefully I will have a DVR by then!).
It did only take 7 days, but they do things out of order than you see on the show and the actors don't help as much as they lead you on to believe
Post a Comment